Aplicação da Metodologia Building Information Modeling para Subestação Elevadora de Alta Tensão

Authors

  • Thaís Pereira de Mello Marte Engenharia, RJ
  • Gabriel Almeida Klein Centro Federal de Educação Tecnológica Celso Suckow da Fonseca Campus Nova Friburgo, RJ
  • Paulo Victor Xavier Cabral Marte Engenharia, RJ
  • Paulo Victor de Souza Borges Centro Federal de Educação Tecnológica Celso Suckow da Fonseca Campus Nova Friburgo, RJ

Keywords:

Substation, high voltage, BIM, Revit, modeling, elevator substation

Abstract

This article presents the modeling of a high-voltage step-up substation with a double busbar arrangement with a single-breaker to four-switches configuration, using the Building Information Modeling (BIM) methodology. Using Revit software, the main modeling steps are outlined, covering both equipment and the entirety of the substation, specifying the advantages and potential of BIM implementation in substation projects.

Downloads

Published

2024-10-18

Issue

Section

Articles