Comparativo Entre os Sistemas de Aquisição de Dados do SCADA e as Unidades de Medição Fasorial Sincronizada no Controle Secundário de Tensão
DOI:
https://doi.org/10.20906/SBAI-SBSE-2023/3920Keywords:
PMU, SCADA, data acquisition systems, delay time, secondary voltage control, voltage stabilityAbstract
This work aims to present an analysis of the comparison of two data acquisition systems, the Synchronized Phasor Measurement Unit (PMU) and the Supervision and Data Acquisition System (SCADA), in the operation of secondary voltage control in a system 11-bus test, verifying how it responds to the units' processing time, observing the network parameters and their influence on the voltage stability. The adjustments regarding the delay time and the form of acquisition of SCADA and PMU for the appropriate simulations were submitted to events to visualize the behavior in contexts such as line opening and load increase. Contributions to the study that allowed better observations of the behavior of the system.Downloads
Published
2023-10-18
Issue
Section
Articles